Tuqiao Subway Station

From Beijingology

Jump to: navigation, search
Tuqiao Subway Station
Ditie Tuqiao Zhan
地铁土桥站

Above-ground view

Interior view
Station Number(s) BT13
Location National Highway 103, Tongzhou District
Lines Subway Batong Line
Platforms 2
First Train (Batong Line to Sihui)
Last Train (Batong Line to Sihui)
Disabled Access
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services
Notes
[[|360px]]
Station diagram
Tuqiao Subway Station is a ground-level subway station on the Beijing Subway's Batong Line.

Contents

History

The subway station was completed by 2003 and is the easternmost terminus for the Batong Subway Line. The station opened on December 27, 2003.

Geography

Tuqiao Subway Station is on National Highway 103. In its vicinity are also:

Architecture

Tuqiao station takes the form of a grey altered parallelogram building, as seen from the outside.

Station Layout

Upper Level
(Mixed area)
Exits
Ticket counters
Ticket barriers
Ground Level
(Paid area)
Northern platform Subway Batong Line to Sihui
(Next stop: Linehli)
Southern platform Subway Batong Line to Tuqiao
(Exit only)

Platform Layout

The Batong Line uses two side platforms.

Station Services

  • Ticket sales: Automatic and manned ticketing offices available (the automated ticketing system is not yet fully in place).
  • Toilets: Free public toilets on the Upper Level.

Train Services

Neighboring Subway Stations

Exits

Tuqiao station has two exits. All exits are accessible by means of a through hall on the Upper Level.

Click on an image to see a larger picture.

  • Exit A (west):
  • Exit B (east):

Exit Access

  • Exit A: stairs
  • Exit B: stairs


Beijing Subway Batong Line
(Sihui - Tuqiao)
13 stations • 18.9 km • Template:MBatongInterval
Subway Batong Line
Sihui (⇆ Line 1), Sihui East (⇆ Line 1), Gaobeidian, Communication University of China, Shuangqiao, Guanzhuang, Baliqiao, Tongzhou Beiyuan, Guoyuan, Jiukeshu, Liyuan, Linheli, Tuqiao
⇆ interchange stations; items in italics refer to stations or lines not yet opened


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools