Subway Line 7

From Beijingology

Jump to: navigation, search
Subway Line 7
Ditie Qi Hao Xian
地铁七号线
地鐵七號線

[[|360px]]
Number of Stations
Color
Length  km
Interchange Stations
(total: -; - currently in use)
Termini Beijing West Railway Station Subway Station (northern terminus)
Jiaohuachang Subway Station (southern terminus)
Depots
First Service ()
Last Service ()
Coverage Beijing West Railway Station, Liangguang Avenue, Dajiaoting
Rolling Stock
Journeys
Year Opened /
Last Extension
2012
Notes
[[]]

Subway Line 7 is a line in the Beijing Subway which will run from the Beijing West Railway Station Subway Station all the way through to Jiaohuachang Subway Station. The line runs through southern Beijing in a west-east direction.

History

Construction on Subway Line 7 will begin in 2008, with the entire subway line ready by 2012.

Route

Subway Line 7 will run at the Beijing West Railway Station Subway Station interchange station with Subway Line 9. The route sees the subway line pass underneath Liangguang Avenue before heading southeast to Baiziwan east of the eastern 3rd Ring Road. Line 7 ends just northwest of the start of the Jingjin Expressway.

The line runs mainly west-east, although there is a sharp turn southeastwards after the eastern 3rd Ring Road.

Stations

Subway Line 7 is expected to have up to 23 stops, with 9 of them interchange stations.

Information about the planned route and stations may change as time goes by.


Beijing Subway Line 7
(Beijing West Railway Station - Coking Plant)
- stations, - km
Subway Line 7
Beijing West Railway Station (⇆ Line 9), Wanzi, Daguanying, Guang'anmen, Niujie, Caishikou (⇆ Line 4), Hufangqiao, Zhushikou (⇆ Line 8), Dushijie, Ciqikou (⇆'Line 5), Xingfudajie, Xizhaosi, Guangqumen East, Shuangjing (⇆ Line 10), Guangqulu (⇆ Line 14), Dajiaoting, Baiziwan, Hua'ergongchang, Zinanjiayuan, Happy Valley, Fatou, Boli'erchang, Coking Plant
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools