Songjiazhuang Subway Station

From Beijingology

Jump to: navigation, search
Songjiazhuang Subway Station
Ditie Songjiazhuang Zhan
地铁宋家庄站
地鐵宋家莊站

Above-ground view

Interior view
Station Number(s) 501, 10--, YZ--
Location Songzhuang Road, Fengtai District
Lines Subway Line 5, Subway Line 10, Yizhuang Subway Line
Platforms 2 side platforms
First Train 05:19 (Subway Line 5 to Tiantongyuan North)
Last Train 23:10 (Subway Line 5 to Tiantongyuan North)
Disabled Access Disabled services available (in part)
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services Bike and car parks available
Notes Terminus station; passengers must exit the station and re-enter using a new subway fare to ride on Subway Line 5 heading back north to Tiantongyuan North.
[[|360px]]
Station diagram

Songjiazhuang Subway Station is a subway station on the Beijing Subway's Line 5.

By 2012, the station will connect with the Subway Yizhuang Line and Subway Line 10.

Originally, four lines were expected to connect at Songjiazhuang -- Lines 5, 10, 11 and Yizhuang. The merger of Lines 10 and 11 into one line (Line 10) has meant that only three lines will join at Songjiazhuang.

Contents

History

The station was built in 2007 and opened to the public at around 14:00 on October 7, 2007.

This subway station will become an interchange station; hence the lack of lifts from the station to the ground.

Geography

The station was built in 2007 and lies on Songzhuang Road, near Hengyitiao Street (1st Cross Alley). Songjiazhuang is expected to link to a future rail connection further south to Yizhuang.

In its vicinity are also:

Architecture

Songjiazhuang station takes the form of two grey-and-glass buildings on Songzhuang Road.

Interior

Songjiazhuang station has two underground levels, with the platform on the lower level. Underground Level 1 is a through hall; passengers from Underground Level 2 can take any staircase or elevator to reach all exits on the upper level.

The station is supported by two rows of green square columns at platform level, with one column on each side platform.

Station Layout

Subway Line 5 Part

Ground Level
(Public area)
Exits (A, B)
Underground Level 1
(Mixed area)
Access to all exits
Manned ticket counters
Fare adjustment counter
Automatic ticket machines (- combo)
Beijing Super Pass card kiosks (-)
Ticket barriers (-)
Underground
Level 2

(Paid area)
Western platform Subway Line 5 to Songjiazhuang
(Exit only)
Eastern platform Subway Line 5 to Tiantongyuan North
(Next station: Liujiayao)

Subway Line 10 Part

The Line 10 part of Songjiazhuang station is presently under construction.

Subway Yizhuang Line Part

The Yizhuang Line part of Songjiazhuang station is presently under construction.

Platform Layout

Line 5 uses two side platforms.

  • Line 5: Doors will open on the right.

Station Services

Underground level 1 concourse at Songjiazhuang station (Line 5 part)
Enlarge
Underground level 1 concourse at Songjiazhuang station (Line 5 part)
  • Free public toilets on the platform (at the southeasternmost end).

Train Services

Neighboring Subway Stations

Exits

Songjiazhuang station presently has two exits. All exits are accessible by means of a through hall on Underground Level 1.

  • To see a larger picture, click on the image

Exit Access

  • Exit A: stairs only
  • Exit B: stairs only

Sources and References


Beijing Subway Line 5
(Tiantongyuan North - Songjiazhuang)
23 stations • 27.6 km • Minimum 3 minutes between trains
Subway Line 5
Tiantongyuan North, Tiantongyuan, Tiantongyuan South, Lishuiqiao (⇆ Line 13), Lishuiqiao South, Beiyuanlu North, Datunlu East (⇆ Line 15), Huixinxijie Beikou, Huixinxijie Nankou (⇆ Line 10), Hepingxiqiao, Hepinglibeijie, Yonghegong Lama Temple (⇆ Line 2), Beixinqiao, Zhangzizhonglu, Dongsi (⇆ Line 6), Dengshikou, Dongdan (⇆ Line 1), Chongwenmen (⇆ Line 2), Ciqikou (⇆ Line 7), Tiantandongmen, Puhuangyu (⇆ Line 14), Liujiayao, Songjiazhuang (⇆ Line 10 and Yizhuang Line)
⇆ interchange stations; items in italics refer to lines not yet opened

Beijing Subway Line 10 (Phase 1 Now Open; Phase 2 Opens 2012)
(Outer orbital; Stage 1: Bagou - Jinsong presently open)
22 stations • 24.68 km • Minimum 3 minutes 30 seconds
Subway Line 10
Bagou (⇆ Xijiao Line), Suzhoujie, Haidian Huangzhuang (⇆ Line 4), Zhichunli, Zhichunlu (⇆ Line 13), Xitucheng, Mudanyuan, Jiandemen, Beitucheng (⇆ Line 8), Anzhenmen, Huixinxijie Nankou (⇆ Line 5), Shaoyaoju (⇆ Line 13), Taiyanggong, Sanyuanqiao (⇆ Airport Express), Liangmaqiao, Agricultural Exhibition Center, Tuanjiehu, Hujialou (⇆ Line 6), Jintaixizhao, Guomao (⇆ Line 1), Shuangjing (⇆ Line 7), Jinsong, Panjiayuan, Shilihe, Fenzhongsi, Chengshousi, Songjiazhuang (⇆ Line 5 and Yizhuang Line), Shiliuzhuang, Dahongmen, Jiaomen East, Jiaomen West (⇆ Line 4), Caoqiao, Fanjiacun, Mengjiacun, Qianniwa, Xiju (⇆ Line 14), Liuliqiao West (⇆ Line 9), Maguanying, Lianhuaqiao, Gongzhufen (⇆ Line 1), Xidiaoyutai, Wulu (⇆ Line 6 and Datai Line), Chedaogou, Changchunqiao, Huoqiying
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required. (This applies only to stations in Phase 2 of Line 10.)


Beijing Subway Yizhuang Line
(Songjiazhuang - Yizhuang Railway Station)
14 stations • - km • Template:MYizhuangInterval
Subway Yizhuang Line
Songjiazhuang (⇆ Lines 5, 10), Hongsi, Xiaohongmen, Jiugong (⇆ Line L5), Yizhuangqiao, Yizhuang Culture Park, Wanyuanjie, Rongjingdongjie (⇆ Line L5), Rongchangdongjie, Tongjinanlu, Jinghailu, Ciqu South, Ciqu, Yizhuang Railway Station (⇆ Jingjin Intercity Railway and Subway Line S6)
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools