Sihui Subway Station

From Beijingology

Jump to: navigation, search
Sihui Subway Station
Ditie Sihui Zhan
地铁四惠站
地鐵四惠站

Above-ground view

Interior view
Station Number(s) 124
BT01
Location Sihui Bridge, Chaoyang District
Lines Subway Line 1, Subway Batong Line
Platforms 4 (2x 2 one central platform)
First Train 04:56 (Line 1 to Pingguoyuan)
Last Train 23:48 (Line 1 to Sihui East)
Disabled Access
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services
Notes
[[|360px]]
Station diagram
Sihui Subway Station is a ground-level subway station on the Beijing Subway's Line 1 and the Subway Batong Line.

Sihui station is named after the Sihui area, in particular the nearby Sihui Bridge.

The station appears as a a grey-glass building.

Contents

History

The subway station was completed by 1999. Sihui Station opened to the public beginning September 28, 1999. Services for the Subway Batong Line commenced on December 27, 2003.

Geography

The station lies at the northeastern corner of Sihui Bridge. In its vicinity are also:

Architecture

Sihui station appears as a grey-glass building.

Interior

Sihui station has two floors, with the platform on the ground level. The Upper Level is a through hall; passengers from the platforms can take any staircase or elevator to reach all exits on the upper level. The station is supported by rows of cyan-white and yellow rectangular columns at platform level.

Station Layout

Upper Level
(Mixed area)
Exits
Ticket counters
Ticket inspection
Ground
Level

(Passengers only)
Northern platform (northern half) Subway Line 1 to Pingguoyuan
(Next stop: Dawanglu)
Northern platform (southern half) Subway Line 1 to Sihui East
(Next stop: Sihui East)
Middle platform (southern half) Subway Batong Line (Exit only)
Southern platform Subway Batong Line to Tuqiao
(Next stop: Sihui East)

Platform Layout

Station Services

  • Ticket sales: Ticket sales are currently handled by staff only.
  • Toilets: Toilets are available on the upper level.

Train Services

  • Subway Line 1:
    • Service interval: Minimum 2 minutes 15 seconds (3 minutes over weekends)
    • To Pingguoyuan (next station: Dawanglu):
      • First train: 04:56
      • Last train: 23:17
    • To Sihui East (next station: Sihui East):
      • First train: 05:37
      • Last train: 23:48
  • Subway Batong Line:
    • Service interval: Minimum 3 minutes 30 seconds
    • To Tuqiao (next station: Sihui East):
      • First train: 06:00
      • Last train: 22:45

Neighboring Subway Stations

Exits

Sihui station has four exits, which are shared with Line 1 and the Batong Line. All exits are accessible by means of a through hall on Upper Level 1.

  • To see a larger picture, click on the image
  • Exit A (southeast):
  • Exit B (southwest):
  • Exit C (northeast):
  • Exit D (northwest):

Exit Access

  • Exit A: stairs only
  • Exit B: stairs only
  • Exit C: stairs only
  • Exit D: stairs only


Beijing Subway Line 1
(Pingguoyuan - Sihui East)
23 stations • 31.04 km • Minimum 2 minutes 15 seconds (3 minutes over weekends) between trains
Subway Line 1
Pingguoyuan (⇆ Datai Line), Gucheng, Bajiao Amusement Park, Babaoshan, Yuquanlu, Wukesong, Wanshoulu, Gongzhufen (⇆ Line 10), Military Museum (⇆ Line 9), Muxidi, Nanlishilu, Fuxingmen (⇆ Line 2), Xidan (⇆ Line 4), Tian'anmen West, Tian'anmen East, Wangfujing, Dongdan (⇆ Line 5), Jianguomen (⇆ Line 2), Yonganli, Guomao (⇆ Line 10), Dawanglu (⇆ Line 14), Sihui (⇆ Batong Line), Sihui East (⇆ Batong Line)
⇆ interchange stations; items in italics refer to lines not yet opened
Only stations accessible to the general public are shown


Beijing Subway Batong Line
(Sihui - Tuqiao)
13 stations • 18.9 km • Template:MBatongInterval
Subway Batong Line
Sihui (⇆ Line 1), Sihui East (⇆ Line 1), Gaobeidian, Communication University of China, Shuangqiao, Guanzhuang, Baliqiao, Tongzhou Beiyuan, Guoyuan, Jiukeshu, Liyuan, Linheli, Tuqiao
⇆ interchange stations; items in italics refer to stations or lines not yet opened


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools