Sihui East Subway Station

From Beijingology

Jump to: navigation, search
Sihui East Subway Station
Ditie Sihuidong Zhan
地铁四惠东站
地鐵四惠東站

Above-ground view

Interior view
Station Number(s) 125, BT02
Location Just west of Jingtong Railway Bridge, Chaoyang District
Lines Subway Line 1, Subway Batong Line
Platforms 6
First Train 05:04 (Line 1 to Pingguoyuan)
Last Train 23:14 (Line 1 to Pingguoyuan)
Disabled Access
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services
Notes
[[|360px]]
Station diagram
Sihui East Subway Station is a ground-level subway station on the Beijing Subway's Line 1 and the Subway Batong Line.

Sihui East station is so named as it is some distance east of Sihui Bridge.

The station appears as a white building.

Contents

History

The newly expanded Pingguoyuan-bound Line 1 platform
Enlarge
The newly expanded Pingguoyuan-bound Line 1 platform

The subway station was completed by 1999. Sihui East Station opened to the public beginning September 28, 1999. Services for the Subway Batong Line commenced on December 27, 2003.

Originally, this station was named Bawangfen East (地铁八王坟东站); however, finalized plans named the station Sihui East.

Expansion works completed April 7, 2009 saw the removal of tracks on the northernmost part of the station, thus expanding the Line 1 Pingguoyuan-bound platforms. This was needed as the Batong Line now uses 6-car instead of 4-car trains.

Geography

The station lies next to the Jingtong Expressway, just west of the Jingtong Railway bridge In its vicinity are also:

Architecture

Sihui East station appears as a white building.

Interior

Sihui East station has two floors, with the platform on the ground level. The Upper Level is a through hall; passengers from the platforms can take any staircase or elevator to reach all exits on the upper level. The station is supported by rows of cyan-white and yellow rectangular columns at platform level.

Station Layout

Upper Level
(Mixed area)
Exits
Ticket counters
Ticket barriers
Ground
Level

(Paid area)
Platform Subway Line 1 to Pingguoyuan
(Next stop: Sihui)
Platform Subway Line 1 (incoming trains only; please do not board)
Platform Subway Batong Line to Sihui
(Next stop: Sihui)
Platform Subway Batong Line to Sihui East
(Next stop: Gaobeidian)

Platform Layout

Sihui East station uses two central island platforms, forming altogether four platforms.

Station Services

  • Ticket sales: Ticket sales are currently handled by staff only.
  • Toilets: Toilets are available on the upper level.

Train Services

Neighboring Subway Stations

Exits

Sihui station has four exits, which are shared with Line 1 and the Batong Line. All exits are accessible by means of a through hall on Upper Level 1.

  • To see a larger picture, click on the image
  • Exit A (south):
  • Exit B (north):

Neighboring Subway Stations

Exit Access

  • Exit A: stairs only
  • Exit B: stairs only


Beijing Subway Line 1
(Pingguoyuan - Sihui East)
23 stations • 31.04 km • Minimum 2 minutes 15 seconds (3 minutes over weekends) between trains
Subway Line 1
Pingguoyuan (⇆ Datai Line), Gucheng, Bajiao Amusement Park, Babaoshan, Yuquanlu, Wukesong, Wanshoulu, Gongzhufen (⇆ Line 10), Military Museum (⇆ Line 9), Muxidi, Nanlishilu, Fuxingmen (⇆ Line 2), Xidan (⇆ Line 4), Tian'anmen West, Tian'anmen East, Wangfujing, Dongdan (⇆ Line 5), Jianguomen (⇆ Line 2), Yonganli, Guomao (⇆ Line 10), Dawanglu (⇆ Line 14), Sihui (⇆ Batong Line), Sihui East (⇆ Batong Line)
⇆ interchange stations; items in italics refer to lines not yet opened
Only stations accessible to the general public are shown


Beijing Subway Batong Line
(Sihui - Tuqiao)
13 stations • 18.9 km • Template:MBatongInterval
Subway Batong Line
Sihui (⇆ Line 1), Sihui East (⇆ Line 1), Gaobeidian, Communication University of China, Shuangqiao, Guanzhuang, Baliqiao, Tongzhou Beiyuan, Guoyuan, Jiukeshu, Liyuan, Linheli, Tuqiao
⇆ interchange stations; items in italics refer to stations or lines not yet opened


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools