National Library Subway Station

From Beijingology

Jump to: navigation, search
Image:NoAccess.png
This Subway station is not yet open.
National Library Subway Station has not yet been opened to the public.
Subway Line 4 opens September 30, 2009; Subway Line 9 opens in 2012.
National Library Subway Station
Ditie Guojiatushuanguan Zhan
地铁国家图书馆站
地鐵國家圖書館站

Above-ground view
[[|360px]]
Interior view
Station Number(s) 4--, 9--
Location Just north of Changhe Bridge on Zhongguancun South Street, Haidian District
Lines Subway Line 4, Subway Line 9
Platforms
First Train
Last Train
Disabled Access
Nearby Bus Stations -
Nearby Bus Lines
Park and Ride Services Bike: -
Car: -
Notes This station opens September 30, 2009
[[|360px]]
Station diagram
National Library Subway Station is an underground subway station on the Beijing Subway's Line 4 and on Line 9.

The former name of this station in earlier plans was Baishiqiao station (地铁白石桥站).

Contents

History

The station was built in late 2008 and will open along with Line 4 on September 30, 2009. The Line 9 part opens in 2012.

Geography

The National Library station is north of Changhe Bridge on Zhongguancun South Street and is notably further north from Baishi New Bridge. In its vicinity are also:

  • X (-)

Architecture

This station is still under construction.

Interior

This station is still under construction.

Station Layout

Ground Level
(Public area)
Exits (under construction; no access)

Platform Layout

Line 4 uses a - platform. Cross-platform interchanges are planned between Lines 4 and 9.

  • Line 4: Doors will open to the -.

Station Services

Ticketing

  • Manned ticket counters are expected to be available.
  • Fare adjustment counters are expected to be available.
  • Automatic ticket machine are expected to be available (all expected to be combo; ticket sales and Beijing Super Pass add value)
  • - ticket barriers in all

Parking

  • Bike: -
  • Car: -

Other Services

  • Toilets: -

Train Services

Neighboring Subway Stations

Exits

The National Library Subway Station has - exits. Exits are presently not accessible.

  • To see a larger picture, click on the image


Beijing Subway Line 4 (Opens September 30, 2009)
(Yongfeng - Anheqiao North - Gongyixiqiao)
24 stations (2009), 28 stations (entire line) • - km • Under construction; opens September 28, 2009
Subway Line 4
Yongfeng, Hangtiancheng West, Xibeiwang, Baiwangshan, Anheqiao North, Beigongmen, Xiyuan, Yuanmingyuan, East Gate of Peking University, Zhongguancun, Haidian Huangzhuang (⇆ Line 10), Renmin University, Weigongcun, National Library (⇆ Line 9), Beijing Zoo, Xizhimen (⇆ Lines 2 and 13), Xinjiekou, Ping'anli (⇆ Line 6), Xisi, Lingjing Hutong, Xidan (⇆ Line 1), Xuanwumen (⇆ Line 2), Caishikou (⇆ Line 7), Taoranting, Beijing South Railway Station (⇆ Line 14), Majiapu, Jiaomen West (⇆ Line 10), Gongyixiqiao (⇆ Daxing Line)
⇆ interchange stations; items in italics refer to stations or lines not yet opened
The northern extension (Yongfeng - Baiwangshan) will open at an unspecified time after 2009
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway Line 9 (Opens 2012)
(National Library - Guogongzhuang)
14 stations • - km • Under construction
Subway Line 9
National Library (⇆ Line 4), Chegongzhuangdajie, Sidaokou (⇆ Line 6), Military Museum (⇆ Line 1), Beijing West Railway Station Subway Station (⇆ Line 7), Liuliqiao, Liuliqiao West (⇆ Line 10), Nanmaliandao, Fengtaibeilu (⇆ Line 14), Dongdajie, Fengtai Railway Station, Huaxiang, Yihaihuayuan, Guogongzhuang (⇆ Datai Line)
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools