Meishuguandongjie Subway Station

From Beijingology

Jump to: navigation, search
Meishuguandongjie Subway Station
Ditie Meishuguandongjie Zhan
地铁美术馆东街站
[[Image:|360px]]
Above-ground view
[[Image:|360px]]
Interior view
Station Number(s) 815
Location Meishuguan East Street, Dongcheng District
Lines Subway Line 6, Subway Line 8
Platforms
First Train
Last Train
Disabled Access
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services
Notes
[[|360px]]
Station diagram
* Please note that the name of this subway station is still regarded as tentative. It is possible that a new name be finalized before services officially begin on both the station and the subway line(s) it belongs to.

Meishuguandongjie Subway Station is an underground subway station on the Beijing Subway's Line 6 and Line 8. The station is currently under construction and is expected to be completed by 2012.

This is expected to be the southern terminus for the entire Subway Line 8 until at least 2015.

Contents

History

Construction on Subway Line 6 (Stage 2) and Subway Line 8 (Stage 2) begun on December 8, 2007, with construction on the individual subway stations beginning shortly after.

Meishuguandongjie Subway Station is expected to be complete by 2012, when both subway lines are complete.

Geography

Meishuguandongjie Station is on what is known as Chaofu Road. In its vicinity are also:

Station Layout

Subway Line 6 Section

Under construction

Subway Line 8 Section

Under construction

Platform Layout

Train Services

  • Subway Line 6:
    • Service interval: Under construction
    • Not yet in service
  • Subway Line 8:
    • Service interval: 7 minutes
    • Not yet in service

Neighboring Subway Stations

Exits

Subway Line 6 Exits

  • Under construction

Subway Line 8 Exits

  • Under construction


Beijing Subway Line 6
(Stage 1: Wuluju - Caofang; Stage 2: Beijing Materials University - Dongxiaoying)
19 stations (Stage 1), - km, minimum interval: - minutes
Subway Line 6
Wuluju, Cishousi (⇆ Line 10 and Datai Line), Huayuanqiao, Chegongzhuang West (⇆ Line 12), Chegongzhuang (⇆ Line 2), Ping'anli (⇆ Line 4), Beihai North, Nanluoguxiang (⇆ Line 8), Dongsi (⇆ Line 3, Line 5 and 8), Chaoyangmen (⇆ Line 2), Dongdaqiao, Hujialou (⇆ Line 10), Tianshuiyuan (⇆ Line 14), Shilipu, Qingnianlu, Dalianpo (⇆ Line L4), Huangqu, Changying, Caofang, Beijing Materials University, Beiguanhuandao, Xinhuadajie, Yudaihedajie, Haojiafu, Tongzhouxincheng, Dongxiaoying
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway Line 8 (Phase 1 Now Open; Phase 2: Opens 2012)
(Phase 1: South Gate of Forest Park - Beitucheng; Phase 2: Huoying North - Meishuguandongjie)
4 stations (Phase 1) • 4.53 km • 7 minutes between trains
Subway Line 8
Huoying North, Huoying (⇆ Line 13), Xisanqi, Xisanqi South, Yongtai, Lincuilu, South Gate of Forest Park, Olympic Green, Olympic Sports Center, Beitucheng (⇆ Line 10), Anhuaqiao, Andeli, Guloudajie (⇆ Line 2), Houhai, Di'anmen, Meishuguandongjie (⇆ Line 6)
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required. (This applies only to stations in Phase 2 of Line 8.)


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools