Hujialou Subway Station

From Beijingology

Jump to: navigation, search
Hujialou Subway Station
Ditie Hujialou Zhan
地铁呼家楼站
地鐵呼家樓站

Above-ground view

Interior view
Station Number(s) 6--, 1005
Location Jingguang Bridge, Chaoyang District
Lines Subway Line 6, Subway Line 10
Platforms Line 6: 2 side platforms
Line 10: 2 (on a split island platform)
First Train 05:40 (Line 10 (clockwise to Jinsong; next station: Jintaixizhao))
Last Train 23:20 (Line 10 (counterclockwise to Bagou; next station: Tuanjiehu))
Disabled Access Elevators available
Nearby Bus Stations - Bus Station
Nearby Bus Lines
Park and Ride Services
Notes Connections to BRT Line 2 at exits A, B
[[|360px]]
Station diagram
Hujialou Subway Station is an underground subway station on the Beijing Subway's Line 10. By 2012, Hujialou will become an interchange station with Subway Line 6.

Contents

History

Hujialou station under construction (early February 2008)
Enlarge
Hujialou station under construction (early February 2008)

The station was built in early 2008 and has been opened to the public as of 14:00 on July 19, 2008. The Subway Line 6 part will open by 2012.

Geography

Hujialou Station is at the northern part of Jingguang Bridge. In its vicinity are also:

Architecture

Hujialou station consists of three exits taking the form of boxes which are mostly made up of glass; up to two (at least one) have been built into neighboring buildings. The boxes are enclosed in grey outlines.

Interior

Station art at Hujialou station
Enlarge
Station art at Hujialou station

Hujialou station has two underground levels, with the platform on the lower level. Underground Level 1 is a through hall; passengers from Underground Level 2 can take any staircase or elevator to reach all exits on the upper level.

The station is supported by two rows of thin white columns (each per split side platform) at platform level.

Station Layout

Ground Level
(Public area)
Exits (A, B, C1, C2, D)
Underground Level 1
(Mixed area)
Enclosed central hall Access to all exits
Manned ticket counters
Fare adjustment counter
Automatic ticket machines (- combo)
Beijing Super Pass card kiosks (-)
Ticket barriers (-)
Interchange with Line 6
Underground
Level 2

(Paid area)
Western platform Subway Line 10 (clockwise to Jinsong)
(Next station: Jintaixizhao)
Eastern platform Subway Line 10 (counterclockwise to Bagou)
(Next station: Tuanjiehu)

Platform Layout

Line 6 is expected to use two side platforms. Line 10 uses a split island platform.

  • Line 6: Doors will open to the right.
  • Line 10: Doors will open on the left.

Station Services

Underground Level 1 concourse at Hujialou station
Enlarge
Underground Level 1 concourse at Hujialou station

Ticketing

  • Manned ticket counters available
  • Fare adjustment counters available
  • Automatic ticket machines: - in all (all combo; ticket sales and Beijing Super Pass add value)
  • - ticket barriers in all

Note: An in ticket barrier permits entry into the Subway system; an out barrier allows passengers to exit the System. Wide barriers allow both access into and out of the Subway system in the same barrier. All numbers given are upper limits; in the case of combo ticket barriers, which can be used as either an "in" gate or "out" gate, numbers will vary. Please note that some barriers may be out of service at times.

Parking

  • Bike: Bike sheds available (exit -)
  • Car: No nearby parking lots available

Other Services

  • Toilets: Free public toilets at the southern end of underground level 2 (western platform to Jinsong only)

Train Services

Neighboring Subway Stations

Exits

Hujialou Subway Station presently has five exits. All exits are accessible by means of a through hall on Underground Level 1. Line 6 is expected to add three more exits.

  • To see a larger picture, click on the image

Line 6 Part

Line 10 Part

Exit Access

Line 6 Part

Line 10 Part

  • Exit A:
  • Exit B: stairs and escalators
  • Exit C:
    • Exit C1:
    • Exit C2: stairs
  • Exit D: stairs and escalators


Beijing Subway Line 6
(Stage 1: Wuluju - Caofang; Stage 2: Beijing Materials University - Dongxiaoying)
19 stations (Stage 1), - km, minimum interval: - minutes
Subway Line 6
Wuluju, Cishousi (⇆ Line 10 and Datai Line), Huayuanqiao, Chegongzhuang West (⇆ Line 12), Chegongzhuang (⇆ Line 2), Ping'anli (⇆ Line 4), Beihai North, Nanluoguxiang (⇆ Line 8), Dongsi (⇆ Line 3, Line 5 and 8), Chaoyangmen (⇆ Line 2), Dongdaqiao, Hujialou (⇆ Line 10), Tianshuiyuan (⇆ Line 14), Shilipu, Qingnianlu, Dalianpo (⇆ Line L4), Huangqu, Changying, Caofang, Beijing Materials University, Beiguanhuandao, Xinhuadajie, Yudaihedajie, Haojiafu, Tongzhouxincheng, Dongxiaoying
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.


Beijing Subway Line 10 (Phase 1 Now Open; Phase 2 Opens 2012)
(Outer orbital; Stage 1: Bagou - Jinsong presently open)
22 stations • 24.68 km • Minimum 3 minutes 30 seconds
Subway Line 10
Bagou (⇆ Xijiao Line), Suzhoujie, Haidian Huangzhuang (⇆ Line 4), Zhichunli, Zhichunlu (⇆ Line 13), Xitucheng, Mudanyuan, Jiandemen, Beitucheng (⇆ Line 8), Anzhenmen, Huixinxijie Nankou (⇆ Line 5), Shaoyaoju (⇆ Line 13), Taiyanggong, Sanyuanqiao (⇆ Airport Express), Liangmaqiao, Agricultural Exhibition Center, Tuanjiehu, Hujialou (⇆ Line 6), Jintaixizhao, Guomao (⇆ Line 1), Shuangjing (⇆ Line 7), Jinsong, Panjiayuan, Shilihe, Fenzhongsi, Chengshousi, Songjiazhuang (⇆ Line 5 and Yizhuang Line), Shiliuzhuang, Dahongmen, Jiaomen East, Jiaomen West (⇆ Line 4), Caoqiao, Fanjiacun, Mengjiacun, Qianniwa, Xiju (⇆ Line 14), Liuliqiao West (⇆ Line 9), Maguanying, Lianhuaqiao, Gongzhufen (⇆ Line 1), Xidiaoyutai, Wulu (⇆ Line 6 and Datai Line), Chedaogou, Changchunqiao, Huoqiying
⇆ interchange stations; items in italics refer to stations or lines not yet opened
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required. (This applies only to stations in Phase 2 of Line 10.)


Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools