Guogongzhuang Subway Station
From Beijingology
| Guogongzhuang Subway Station Ditie Guogongzhuang Zhan 地铁郭公庄站 地鐵郭公莊站 | |
|---|---|
| [[Image:|360px]] Above-ground view | |
| [[Image:|360px]] Interior view | |
| Station Number(s) | 9--, FS-- |
| Location | Crossing between Liujuan South Road and the southern extension of Wanshou Road, Fengtai District |
| Lines | Subway Line 9, Subway Fangshan Line |
| Platforms | 2 side platforms |
| First Train | |
| Last Train | |
| Disabled Access | |
| Nearby Bus Stations | |
| Nearby Bus Lines | |
| Park and Ride Services | |
| Notes | |
| [[|360px]] Station diagram | |
Guogongzhuang Subway Station is an underground subway station on the Beijing Subway's Line 9 and Fangshan Line. The station is currently under construction and is expected to be completed by around 2012.
Contents |
[edit]
History
Construction on Line 9 begun in late 2007, with construction on the individual subway stations beginning shortly after.
Guogongzhuang Subway Station is expected to be completed by 2012, when Subway Line 9 opens up.
[edit]
Geography
Guogongzhuang Station is at the crossing between Liujuan South Road and the southern extension to Wanshou Road. In its vicinity are also:
- - (-)
[edit]
Station Layout
[edit]
Subway Line 9 Part
Under construction
[edit]
Subway Fangshan Line Part
Under construction
[edit]
Platform Layout
At least the Line 9 part is known to use two side platforms.
- Subway Line 9: Doors will open on the right
- Subway Datai Line: Under construction
[edit]
Train Services
- Subway Line 9:
- Service interval: Under construction
- Not yet in service
- Subway Fangshan Line:
- Not yet in service
[edit]
Neighboring Subway Stations
- Subway Line 9:
- Fengtai Technology Park: - mins, 1.11 km north
- Subway Fangshan Line:
- -: - mins, km southwest
[edit]
Exits
[edit]
Subway Line 9 Part
Line 9 is expected to have four exits.
- Exit A (northwest):
- Exit B (northeast):
- Exit C (southeast):
- Exit D (southwest):
[edit]
Subway Fangshan Line Part
- Under construction
| Beijing Subway Line 9 (Opens 2012) (National Library - Guogongzhuang) 14 stations • - km • Under construction | | |||
| ||||
| Beijing Subway System (Current as of July 19, 2008) | | |||
| ||||

