Gongyixiqiao Subway Station

From Beijingology

Jump to: navigation, search
Image:NoAccess.png
This Line 4 Subway station is not yet open.
Gongyixiqiao Subway Station has not yet been opened to the public.
Subway Line 4 opens September 30, 2009.
Gongyixiqiao Subway Station
(Gongyi West Bridge Subway Station)

Ditie Gongyixiqiao Zhan
地铁公益西桥站
地鐵公益西橋站

Above-ground view
[[{{{interior}}}|360px]]
Interior view
Station Number(s)
Location North of crossing between Majialou East Road and Majiapu West Road, Fengtai District
Lines Subway Line 4, Subway Daxing Line
Platforms
First Train (Line - (-clockwise; next stop: -))
Last Train (Line - (-clockwise; next stop: -))
Disabled Access
Nearby Bus Stations - Bus Station
Nearby Bus Lines
Park and Ride Services
Notes This station opens on September 28, 2009
[[|360px]]
Station diagram
Gongyixiqiao Subway Station is an underground subway station on the Beijing Subway's Line 4 and the Daxing Line.

Contents

History

The station was built in 2005. The Line 4 part will open to the public on September 28, 2009.

In previous plans, this station was given the name Majialou station (地铁马家楼站).

Geography

Gongyixiqiao Station is on Majiapu West Road, just north of the crossing with Majialou East Road. In its vicinity are also:

Architecture

This station is still under construction.

Interior

This station is still under construction.

Station Layout

Ground Level
(Public area)
Exits (under construction; no access)

Platform Layout

Line 4 is expected to use two central island platforms.

  • Line 4: Doors will open on the left

Station Services

Ticketing

  • Manned ticket counters are expected to be available.
  • Fare adjustment counters are expected to be available.
  • Automatic ticket machine are expected to be available (all expected to be combo; ticket sales and Beijing Super Pass add value)
  • - ticket barriers in all

Facilities for Disabled Passengers

  • Elevator to ground level expected to be available near exit -
  • Elevators to platform level expected to be available
  • Passageways for the blind expected to be available throughout
  • - wide, wheelchair accessible ticket barriers
  • Doors - provide support for wheelchair users
  • Wheelchair accessible toilets expected to be available

Toilets

  • Data not yet available

Parking

  • Bike: -
  • Car: -

Other Services

  • Police office: -

Train Services

Neighboring Subway Stations

Exits

Gongyixiqiao station is expected to have up to 6 exits. Exits are presently not accessible.

  • Exit information at this stage is tentative and subject to change without notice
  • To see a larger picture, click on the image

Exits


Beijing Subway Line 4 (Opens September 30, 2009)
(Yongfeng - Anheqiao North - Gongyixiqiao)
24 stations (2009), 28 stations (entire line) • - km • Under construction; opens September 28, 2009
Subway Line 4
Yongfeng, Hangtiancheng West, Xibeiwang, Baiwangshan, Anheqiao North, Beigongmen, Xiyuan, Yuanmingyuan, East Gate of Peking University, Zhongguancun, Haidian Huangzhuang (⇆ Line 10), Renmin University, Weigongcun, National Library (⇆ Line 9), Beijing Zoo, Xizhimen (⇆ Lines 2 and 13), Xinjiekou, Ping'anli (⇆ Line 6), Xisi, Lingjing Hutong, Xidan (⇆ Line 1), Xuanwumen (⇆ Line 2), Caishikou (⇆ Line 7), Taoranting, Beijing South Railway Station (⇆ Line 14), Majiapu, Jiaomen West (⇆ Line 10), Gongyixiqiao (⇆ Daxing Line)
⇆ interchange stations; items in italics refer to stations or lines not yet opened
The northern extension (Yongfeng - Baiwangshan) will open at an unspecified time after 2009
Please note: Best efforts have been made at researching and presenting all details about Subway lines under construction or under planning. Nonetheless, changes in station names, routes, or opening times, or the addition or removal of Subway stations, may occur at any time without prior notice. Information presented here should not be used where absolute precision is required.

Template:Subway Daxing Line

Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools