Dongdan Subway Station

From Beijingology

Jump to: navigation, search
Dongdan Subway Station
Ditie Dongdan Zhan
地铁东单站
地鐵東單站

Above-ground view

Interior view
Station Number(s) 119
Location Dongdan Crossing, Dongcheng District
Lines Subway Line 1, Subway Line 5
Platforms Each line: 2 (on a single central platform)
First Train 05:09 (Subway Line 1 to Pingguoyuan)
Last Train 23:36 (Subway Line 1 to Sihui East)
Disabled Access Elevators available (Line 5 exits A and D only).
Nearby Bus Stations
Nearby Bus Lines
Park and Ride Services Bike parking lots available at the exit.
Notes Transfer passageways especially crowded during morning and evening rush hours
[[|360px]]
Station diagram
Dongdan Subway Station is an underground subway station on the Beijing Subway's Line 1 and Line 5.

Dongdan station is named after Dongdan Crossing, which back in the day was the eastern terminus on Beijing's west-east axis.

The Line 1 part of Dongdan station takes the shape of two tan boxes (exits A and B) or two integrated exits into the underpass system (exits C and D) The Line 5 part are either integrated into the underpass system (exits A and D) or are two boxes with alternating glass/grey stripes (exits B and C). No exit connects directly with Oriental Plaza. The livery of the station at platform level is either marble (Line 1 part) or bright orange (Line 5 part).

Contents

History

Line 5 part of Dongdan station under construction (October 2004)
Enlarge
Line 5 part of Dongdan station under construction (October 2004)

The Line 1 part of Dongdan station opened on September 28, 1999, as Subway Line 1 extended from Xidan station to Sihui East station.

Beginning 14:00 on October 7, 2007, Dongdan became an interchange as the Line 5 part officially entered service, along with the two interchange passageways.

In early 2008, the two interchange passageways, which used to be bidirectional, were made one-way after an accident with the at-level escalator.

Geography

Dongdan Station is right underneath Dongdan Crossing. In its vicinity are also:

Architecture

The Line 1 part of Dongdan station takes the shape of two tan boxes (exits A and B), a blue tube entrance (exit C), or an exit integrated into the underpass system (exit D) The Line 5 part are either integrated into the underpass system (exits A and D) or are two boxes with alternating glass/grey stripes (exits B and C).

Interior

All parts of Dongdan station have two underground levels, with the platform on the lower level. For the Line 1 part, all Line 1 exits are accessible through a central hall. For the Line 5 part, Underground Level 1 is a split hall between a northern side hall with exits A and B, and a southern side hall with exits C and D. Passengers from Underground Level 2 must choose their exits in advance before leaving the platform level.

Station Layout

Subway Line 1 Part

Ground Level
(Public area)
Exits (A, B, C, D)
Underground Level 1
(Mixed area)
Through hall Access to all exits
Manned ticket counter
Fare adjustment counter
Automatic ticket machines (-)
Beijing Super Pass card kiosks (-)
Ticket barriers (-)
Interchange with Subway Line 5
Underground
Level 2

(Paid area)
Northern platform Subway Line 1 to Pingguoyuan
(Next station: Wangfujing)
Southern platform Subway Line 1 to Sihui East
(Next station: Jianguomen)

Line 5 Part

Ground Level
(Public area)
Exits (A, B, C, D)
Underground
Level 1

(Mixed area)
Northern side hall
(Exits A, B)
Access to exits A and B
Manned ticket counter
Fare adjustment counter
Automatic ticket machines (- combo)
Beijing Super Pass card kiosks (1)
Ticket barriers (-)
Interchange with Subway Line 1 (one-way; no access to Line 1)
Southern side hall
(Exits C, D)
Access to exits B and C
Manned ticket counter
Fare adjustment counter
Automatic ticket machines (- combo)
Beijing Super Pass card kiosks (1)
Ticket barriers (-)
Interchange with Subway Line 1 (one-way; change here for Line 1)
Underground
Level 2

(Paid area)
Western platform Subway Line 5 to Songjiazhuang
(Next station: Chongwenmen)
Eastern platform Subway Line 5 to Tiantongyuan North
(Next station: Dengshikou)

Interchange

The interchange passageways; this one is bound for Line 1
Enlarge
The interchange passageways; this one is bound for Line 1

The interchange at Dongdan is especially crowded during peak hours, and at lunchtime, too, can be congested. Trains arriving mid-morning and mid-afternoon tend to set off less passengers, thus reducing flow at the interchange passageways. Transfers to Line 1 can get especially crowded.

The interchanges used to be bi-directional; however, months after Line 5 opened, and especially after an accident with the at-level escalator, the interchanges have been made one-way only. Line 1 passengers transferring to Line 5 now use the northern passageway; those transferring from Line 5 to Line 1 now use the southern passageway. The situation has improved somewhat, but the fact that the at-level escalator is off during rush hours still doesn't completely solve the problem.

In any case, the interchange station is very busy for much of the day. During rush hour, the crowd can slow to a crawl; those in a rush who don't mind an extra CNY 2 can use Line 1 exit A and Line 5 exit B to switch between the two lines. (This involves actually leaving the station.)

Interchange Access

  • Line 1 → Line 5: At-level escalators provided but out of service; escalators available throughout (but may be out of service); foldable wheelchair ramps available on stairs
  • Line 5 → Line 1: At-level escalators provided but out of service; escalators available throughout (but may be out of service); foldable wheelchair ramps available on stairs

Optimized Transfers

To transfer quickly from Line 5 to Line 1:

  • Passengers from Tiantongyuan North southbound to Songjiazhuang are advised to take the 2nd carriage (close to the front of the train).
  • Passengers from Songjiazhuang northbound to Tiantongyuan North are advised to take the 4th or 5th carriage (close to the back of the train).

Alternatively, passengers can exit via Line 1 exit A and Line 5 exit B, but this will set them an additional CNY 2 fare.

Platform Layout

Both Lines 1 and 5 use central island platforms.

  • Line 1: Doors will open to the left.
  • Line 5: Doors will open to the left.

Station Services

Underground Level 1 concourse at the Line 5 part of Dongdan station
Enlarge
Underground Level 1 concourse at the Line 5 part of Dongdan station

Line 1 Part

Ticketing

  • Manned ticket counters available
  • Fare adjustment counters available
  • Automatic ticket machines: - in total
  • Beijing Super Pass Add Value machines: -
  • Beijing Super Pass card kiosks: -
  • - ticket barriers in total
  • - close to exits A and D
    • up to - in
    • up to - out
    • - wide
  • - close to exit B and C
    • up to - in
    • up to - out
    • - wide

Facilities for Disabled Passengers

  • Foldable wheelchair ramp to ground level available near exit -
  • Foldable wheelchair ramps to platform level available
  • Passageways for the blind available throughout
  • - wide, wheelchair accessible ticket barriers
  • Doors - provide support for wheelchair users
  • Wheelchair accessible toilets not available in Line 1 part

Toilets

Public toilets are in Underground Level 1 and are in the public area.

Parking

  • Bike: Bike sheds available
  • Car: -

Other Services

  • Police office: Available at this station

Line 5 Part

Ticketing

  • Manned ticket counters available
  • Fare adjustment counters available
  • Automatic ticket machines: - in total (all combo, ticket sales and Beijing Super Pass add value)
    • 5 close to exits A and B
    • - close to exits C and D
  • Beijing Super Pass card kiosks: 2
  • 22 ticket barriers in total
  • 11 close to exits A and B
    • up to - in
    • up to - out
    • 1 wide
  • 11 close to exits C and D
    • up to 7 in
    • up to - out
    • 1 wide

Note: An in ticket barrier permits entry into the Subway system; an out barrier allows passengers to exit the System. Wide barriers allow both access into and out of the Subway system in the same barrier. All numbers given are upper limits; in the case of combo ticket barriers, which can be used as either an "in" gate or "out" gate, numbers will vary. Please note that some barriers may be out of service at times.

Facilities for Disabled Passengers

  • Foldable wheelchair ramp to ground level available near exit -
  • Elevators to platform level available
  • Passageways for the blind available throughout
  • - wide, wheelchair accessible ticket barriers
  • Doors - provide support for wheelchair users
  • Wheelchair accessible toilets available

Toilets

Public toilets are in Underground Level 2 and are at:

  • -

Parking

  • Bike: Bike sheds available ()
  • Car:

Other Services

  • Police office: Available at this station

Train Services

Passenger Flow

  • Rush hour flow: Very high
  • Ordinary flow: High

Dongdan station can be very busy during rush hour, and the interchange passageway, most in demand, can be packed to the extent the crowd slows to a crawl. Even during lunch hour, lots of passengers change lines at this station.

Exits at Dongdan can be less busy as there are eight exits in all, which are all connected inside the paid hour.

Neighboring Subway Stations

Exits

Lines 1 and 5 use different exits, although by means of the interchange passageways, all exits are accessible. Therefore, it is possible for a Line 1 passenger to exit using any Line 5 exit after passing through the interchange passageway; equally, a passenger entering through a Line 5 "box" (exit) can access Line 1 after using the interchange passageway.

Both Lines 1 and 5 use four exits each, bringing the total number of exits at Dongdan to eight.

  • To see a larger picture, click on the image

Subway Line 1 Part

Exit Access

  • Exit A: stairs and escalator (1, up only)
  • Exit B: stairs and escalator (1, up only)
  • Exit C: stairs only
  • Exit D: stairs only

Subway Line 5 Part

Exit Access

  • Exit A: stairs, ramps and escalators
  • Exit B: stairs and escalators
  • Exit C: stairs and escalators
  • Exit D: stairs, ramps and escalators

Local Information

Banks, hospitals, post offices, schools and universities, cafés, teahouses and restaurants, hotels, parks, museums, convenience stores, shopping centers and supermarkets, residential communities, office buildings, entertainment venues, government organizations and Beijing Super Pass Add Value locations are shown in this section.

Government Organizations

Hospitals

Media Organizations

Parks

Public Organizations

Schools

Sports Venues

Sources and References


Beijing Subway Line 1
(Pingguoyuan - Sihui East)
23 stations • 31.04 km • Minimum 2 minutes 15 seconds (3 minutes over weekends) between trains
Subway Line 1
Pingguoyuan (⇆ Datai Line), Gucheng, Bajiao Amusement Park, Babaoshan, Yuquanlu, Wukesong, Wanshoulu, Gongzhufen (⇆ Line 10), Military Museum (⇆ Line 9), Muxidi, Nanlishilu, Fuxingmen (⇆ Line 2), Xidan (⇆ Line 4), Tian'anmen West, Tian'anmen East, Wangfujing, Dongdan (⇆ Line 5), Jianguomen (⇆ Line 2), Yonganli, Guomao (⇆ Line 10), Dawanglu (⇆ Line 14), Sihui (⇆ Batong Line), Sihui East (⇆ Batong Line)
⇆ interchange stations; items in italics refer to lines not yet opened
Only stations accessible to the general public are shown


Beijing Subway Line 5
(Tiantongyuan North - Songjiazhuang)
23 stations • 27.6 km • Minimum 3 minutes between trains
Subway Line 5
Tiantongyuan North, Tiantongyuan, Tiantongyuan South, Lishuiqiao (⇆ Line 13), Lishuiqiao South, Beiyuanlu North, Datunlu East (⇆ Line 15), Huixinxijie Beikou, Huixinxijie Nankou (⇆ Line 10), Hepingxiqiao, Hepinglibeijie, Yonghegong Lama Temple (⇆ Line 2), Beixinqiao, Zhangzizhonglu, Dongsi (⇆ Line 6), Dengshikou, Dongdan (⇆ Line 1), Chongwenmen (⇆ Line 2), Ciqikou (⇆ Line 7), Tiantandongmen, Puhuangyu (⇆ Line 14), Liujiayao, Songjiazhuang (⇆ Line 10 and Yizhuang Line)
⇆ interchange stations; items in italics refer to lines not yet opened

Beijing Subway System
(Current as of July 19, 2008)
Beijing Subway
1 (and Batong), 2, 5, 8 (S Gate of Forest Park - Beitucheng), 10 (Bagou - Jinsong), 13 | Airport Express
Under construction: 4, 6, 8 (Huoying N - S Gate of Forest Park and Beitucheng - Meishuguandongjie), 9, 10 (Panjiayuan - Huoqiying), Daxing, Yizhuang
Under planning: 3, 7, 11, 12, 14, 15, 16, 17 | Changping, Datai, Fangshan, Xijiao
Items in italics refer to lines not yet opened.
(Next opening: Line 4 (Anheqiao North - Gongyixiqiao) on September 30, 2009)
Personal tools